Wastewater

EVALUATION, DESIGN, AND CONSTRUCTION
 

Wastewater Treatment Upgrades

Fort Benton, MT

Project Features

  • I&I study
  • New submerged aeration system
  • Baffle curtains\
  • New clarifiers
  • Gas chlorine disinfection
  • UV disinfection
  • Pumping systems
  • Two new buildings
  • Lagoon sludge removal
  • Chemical feed systems – Alum and polymer
  • Sludge drying beds
  • Irrigation forcemain
  • Golf course irrigation upgrades
  • Instrumentation and control
  • Lift station upgrade
  • 5,252 ft forcemain replacement
  • Lift station backup generator
  • Project cost $5.5 million

Project Grants

  • TSEP $750,000
  • RD Grant $1,229,000
  • DNRC $100,000
  • Rd Loan $2,650,000
  • Local $502,000

Project Activities

  • Preliminary Engineering Report
  • Design
  • Data/Environmental Collection
  • Permitting
  • Field Inspections
  • Bidding Assistance
  • Recommendations
  • Construction Management
  • MPDES Compliance Schedule
  • Administrative Order (AOC)
  • Discharge Permit Violations