Riverside Park Bank Stabilization
City of Laurel, Montana
![](https://www.greatwesteng.com/wp-content/uploads/2017/06/icon_green_25.png)
Project Features
- Rebuilding and stabilizing 715 linear feet of eroded bank
- 7,500 cubic yards of riprap and riparian vegetation
- Removal of 5,500 cubic yards of channel deposition to restore capacity to adjacent bridges
- Rebuilt flood dike along bank to protect Riverside Park
- Project required Army Corps of Engineers 404b Individual Permit and NEPA compliance
- CLOMR Obtained from FEMA before contstruction
- LOMR Completed after construction
- Project cost $1,449,601
![](https://www.greatwesteng.com/wp-content/uploads/2017/06/icon_green_22.png)
Project Grants
- FEMA 75%
- State of Montana 25%
![](https://www.greatwesteng.com/wp-content/uploads/2017/06/icon_green_5.png)
Project Activities
- Conceptual Design
- Floodplain Analysis
- Hydraulic modeling
- MEPA/NEPA Compliance
- Preliminary Engineering Report
- Permitting
- Topographical Survey