Transportation
EVALUATION, DESIGN, AND CONSTRUCTION![](https://www.greatwesteng.com/wp-content/uploads/2017/08/DSC00209.jpg)
HARRIS STREET CTEP SIDEWALKS
BIG TIMBER, MT
![](https://www.greatwesteng.com/wp-content/uploads/2017/06/icon_green_25.png)
Project Features
- 700 feet of concrete sidewalk
- Curb and gutter
- Connects grade school to 4th Street
- Safety improvements
- Drainage improvements
- ADA compliant design
- Project Cost $97,000
![](https://www.greatwesteng.com/wp-content/uploads/2017/06/icon_green_22.png)
Project Grants
- 73% of the project was funded through grants.
- $71,000 CTEP
![](https://www.greatwesteng.com/wp-content/uploads/2017/06/icon_green_5.png)
Project Activities
- Survey
- Conceptual Design
- Recommendations
- Design
- Coordination with MDT
- Bidding Assistance
- Field Inspections
- Construction Management